Categories
YT-ZGFQ-1600C auto high speed slitter and rewinder
- Commodity name: YT-ZGFQ-1600C auto high speed slitter and rewinder
- Product Details
-
Main technical parameter
1. Raw paper width: max: 1600mm, min 800mm
2. Net width; 1600mm
3. Raw paper roll dia: 1200mm
4. Rewinding paper roll dia: 1200mm
5. Raw paper core dia: 76mm
6. Rewinding paper core dia: 76mm
7. Slitting width; 45-1600mm
8. Slitting grame weight: 110-710g/m2
9. Slitting knife nos: 18sets (standard)
10. Upper knife Φ105×Φ75×1.5mm 12crmou
11. Lower round knife Φ105×Φ65×8mm 12crmou
12. Rewinding shaft: pneumatic shaft
13. Brake device:pneumatic control adjustable, double direction control
14. With arc roll (banana roll): middle-high adjustable, make the paper belt spacing, easy slitting
15. Double lower roll: 1set Φ200㎜ PU rubber roll, 1 set steel roll (seamless steel pipe, surface chromed)
16. Loading device: adopt shaftless loading, paper roll going up and down,control by hydraulic. Hydraulic station motor is 1.5KW, left-right moving is mechanical type, electric motor is 1.1KW
17. Speed: max speed is 400mpm
18. Main motor power: 11KW
19. Speed adjusting type: Frequency control
20. Machine weight: 2.85T
21. Overall dimension: 3400×4000×1115mm
Features
1. Loading is automatic shaftless, hydraulic going up and down, mechanical electric clamping, east loading.
2. Equipped with arc roll (banana roll), insure the paper roll after slitting 100% can separate.
3. It can slitting paper roll complete in one time, reduce waste.
Structure features
1. Include reel stand, guide roll, slitting parts, rewinding device, unloading device, pneumatic control system, machine frame etc.
2. Reel stand: locking arm, support arm and hydraulic system.Slitting parts: upper knife shaft, guide roll, upper and lower blade etc.
3. Rewinding parts: double bottom roll, rewinding pneumatic shaft etc.Automatic unloading device: paper pushing cylinder, paper pushing shaft.
4. Operation box: inveter 1set, electric element, button, indicator, contactor is CHINT, electromagnetism valve, reducing valve, oil-water separator etc.
Installation testing and delivery time
ØSeller installation time is 1-2 days, test running 2-3days, seller can arrange one engineer for installation, buyer take charge the free include room and board, travel, communication, and engineer salary.
ØManufacturing cycle: 20-30 days, installation and testing: 1-2days.
ØDelivery time: 30days after deposit (equipment transport to Tianjin)
Packages and transport
ØEach machine packaging adopts plastic cover, easy damage parts use wooden box
ØBuyer transport machine to TIANJIN XINGANG
Payment type
ØAfter Sign a contract, 30% down payment in advance, 70% balance before shipment.
ØWhen seller received the down payment, then start manufacturing
Guarantee period & after-sale service
ØGuarantee period: one years after installation. in the condition of normally using, maintain and keep in good maintain, guarantee 12months , buyer only afford the room and board charge;
In the guarantee period, damage by man-made, accident & after guarantee period, buyer affords the material charge, traffic fee, room and board charge.
We have been taking great efforts all along.We hope that we could do better. The establishment of any cooperation From the first choice!!!
Keywords:
Get A Quote
Note: Please leave your email address, our professionals will contact you as soon as possible!